From the Corp just now -

With plant outages scheduled during work at the Table Rock Powerhouse, The Corps will need to pass inflows using the main spillway.  This spill should remain constant during the duration of the plant outage.  If the units come back online, the spillway gates may be shut and releases be made through the turbines.  Tuesday morning, gates 9 and 10  will be open 2 feet each.  The flow over the spillway will be roughly 3,900 cfs.  Please contact me if you have any questions. 

The way I read it, all turbines will be down for this repair.  3900 cfs will be running over gates 9 and 10 for the duration.

What does this mean?  3900 cfs is equal to about one unit flow.  And shad should come over the spill gates for most if not all the time.

Good fishing ahead!!!!

Lilleys Landing logo 150.jpg

Posted

Hopefully it lasts long enough for me to get back from Florida... Gonna be some good fishing for sure.  Time to restock all those Walters!

Posted
10 minutes ago, Seth said:

Hopefully it will at least run through the weekend. If so, I am hooking the boat up and heading that way!

come pick me up on that flat we talked about this morning Seth :) 

Posted

Last week there was a Mo-Dot sign on the dam that said the hwy across the dam would be shut down 3-11-19 for the day.  Don't know if they changed that or not, but I think I mentioned it to Phil and it said one day.

One day usually means multiple but since they are shutting down the Hwy, I bet they think they can fix it fast.

Posted

Obviously the warmer water coming over will warm things up, but will this have any negative effects with the DO?  I'm sure smarter folks than me have already figured this out, just curious...

  • Root Admin
Posted
22 minutes ago, Bill Babler said:

Last week there was a Mo-Dot sign on the dam that said the hwy across the dam would be shut down 3-11-19 for the day.  Don't know if they changed that or not, but I think I mentioned it to Phil and it said one day.

One day usually means multiple but since they are shutting down the Hwy, I bet they think they can fix it fast.

Might be totally unrelated to this. 3/11 is in a week.  The turbines are free standing at the base of the dam.  Doesn't make much since.

I'm hoping for a couple of weeks at least.  When one turbine is down for maintenance it takes weeks.

Lilleys Landing logo 150.jpg

  • Root Admin
Posted
5 minutes ago, JestersHK said:

Obviously the warmer water coming over will warm things up, but will this have any negative effects with the DO?  I'm sure smarter folks than me have already figured this out, just curious...

No the lake water may be cooler than Taney... DO will be about the same.

Lilleys Landing logo 150.jpg

Posted
3 minutes ago, Phil Lilley said:

Might be totally unrelated to this. 3/11 is in a week.  The turbines are free standing at the base of the dam.  Doesn't make much since.

I'm hoping for a couple of weeks at least.  When one turbine is down for maintenance it takes weeks.

Really a couple weeks?

Any pictures of it yet?

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
×
×
  • Create New...

Important Information

By using this site, you agree to our Terms of Use.